Nr |
Project Title |
Beneficiary |
Year
|
In Moldova
|
|
2012-2016 2017-2022 |
|
|
1 |
ROAD SECTOR PROGRAM SUPPORT PROJECT
Consulting Services for Feasibility Studies Joint Venture with Kocks Consult GmbH (Germany), funded by World Bank:
R1 Chisinau–Ungheni–Sculeni–border to Romania;Length of 116.9km
R16 Balti–Falesti–Sculeni;Length of 54.6km
R13 Balti–Soldanesti–Rabnita (area Balti–Gura Camencii);Length of 39.9km
R33 Hancesti–Lapusna;Length of 39.2km
R34 Hancesti–Leova–Cahul–Slobozia Mare;Length of 167.6km
R3 Chisinau–Hancesti–Cimislia–Basarabeasca (area Hancesti–Cimislia);39.4km
R6 M1 Ialoveni–(area M1–R3);Length of 6km
R9 Soroca–Arionesti–Moghiliov Podolski (area Balti–Criva);Length of 40km
|
State Road Administration |
2010-2011 |
2 |
Consulting Services for Detailed Engineering Design and Preparing Tender Documentation, Joint Venture with Kocks Consult GmbH (Germany), funded by World Bank:
Detailed Engineering Design for road rehabilitation R9 Soroca–Arionesti–Moghiliov Podolski (area Balti–Criva), Length of 30.95km
Detailed Engineering Design R16 Balti–Falesti–Sculeni; Length of 54.69km
Detailed Engineering Design R33 Hancesti–Lapusna; Length of 39.90km
Detailed Engineering Design R34 Hancesti–Leova–Cahul–Slobozia Mare; Length of 125.10km
Detailed Engineering Design M14 Brest–Briceni–Chisinau–Tiraspol–Odessa, 133km
|
State Road Administration |
2011 |
3 |
Correcting the Detailed Design for Administrative block of Veterinary Diagnostic Center, Chisinau
|
National Veterinary Diagnostic Center |
2010 |
4 |
Author supervision of execution Administrative block of Veterinary Diagnostic Center, Chisinau
|
National Veterinary Diagnostic Center |
2010
|
5 |
Access road through Nemteni village, Hancesti district |
Town Hall of Hancesti district INCP „Urbanproiect” |
2010 |
6 |
Construction of the road in Cotul Morii (Leuseni), road in Hancesti, road in Nemteni, Hancesti district |
Town Hall of Hancesti district INCP „Urbanproiect” |
2010 |
7 |
Pavement repair on the road R1Chisinau–Ungheni–Sculeni–border to Romania, km 5.4 ÷ km 9.7 |
State Road Administration |
2010 |
8 |
Liquidation of consequences of floods in Zaicani village, Criuleni district |
Zaicani Town Hall, Criuleni district |
2010 |
9 |
Detailed Engineering Design and Preparing Tender Documentation for Road Rehabilitation of M2 Sarateni–Soroca–Drochia Intersection(93km), sector km71+194 ÷ km89+824, funded by Millennium Challenge Corporation (USA) |
NATHAN / URS, United States of America |
2010 |
10 |
Road through Pohrebea village, Dubasari district |
Pohrebea Town Hall, Dubasari district |
2010 |
11 |
Feasibility study „Road repair L37 Lipcani–Balasinesti–Corjeuti–Tarnova, km 21+350 ÷ km 27+000 through Corjeuti village, Briceni district” |
Corjeuti Town Hall, Briceni district |
2010 |
12 |
Multifunctional Community Center „Dainuire” from Hirjauca village, Calarasi district |
Hirjauca Town Hall, Calarasi district |
2010 |
13 |
Multifunctional Community Center „Aspiratie” from Horodiste village, Calarasi district |
Horodiste Town Hall, Calarasi district |
2010 |
14 |
Road access construction Flamanzeni village, com.Coscodeni, Sangerei district |
Flamanzeni Town Hall, com.Coscodeni, Sangerei district |
2010 |
15 |
Designed works for construction of interchange between road M2 Chisinau–Soroca–border to Ukraine, km 48 and national road R20 Rezina–Orhei–Calarasi, km 45+323” |
State Road Administration |
2010 |
16 |
Existing condition examination works for the roads within the Millennium Challenge Corporation Project and Preliminary Design of 303 km as subcontractor to the USA Company URS Group, financed through Millennium Challenge Corporation Program,USA:
M14 Brest–Briceni–Chisinau–Tiraspol–Odessa, Length of 133km
M21 Chisinau–Dubasari–Poltava (Ukraine), Length of 37km
R9 Soroca–Arionesti–Moghiliov Podolski (near Drochia–Arionesti junction),Length of 40km
M2 Chisinau–Soroca, Sarateni–Soroca–Drochia junction, Length of 93km
|
URS Group ING, United States of America |
2009 |
17 |
Rehabilitation Project for the section Comrat–Ciumai, with the total length of 60km, Joint Venture with Kocks Consult GmbH, financed by EU |
Delegation of the European Union to the Republic of Moldova |
2009 |
18 |
Feasibility Study for Rehabilitation and Extension of the road M3 Chisinau–Giurgiulesti/Romanian border, with the total length of 217km, Joint Venture with Kocks Consult GmbH, financed by EU |
Delegation of the European Union to the Republic of Moldova |
2008-2009 |
19 |
Detailed Design “Construction of the port terminal in Molovata village, Dubasari region” |
“Bacul Molovata” SA, Dubasari region |
2008 |
20 |
Detailed Design “Construction of the road M3–access road to Milestii Mici village, Ialoveni region” |
State Road Administration,Chisinau municipality |
2008 |
21 |
Detailed Design “Construction of Giurgiulesti Port infrastructure, Cahul region” |
Ungheni River Port |
2008 |
22 |
Detailed Design “Total repair of the road to Selemet village, Cimislia region” |
Selemet Town Hall, Cimislia Region |
2008 |
23 |
Author Supervision Rezina–Orhei–Calarasi, km 35÷46
|
State Road Administration, Chisinau municipality |
2008 |
24 |
Author Supervision Rezina–Orhei–Calarasi, km 50÷64 (Section Orhei–Vatici) |
State Road Administration, Chisinau municipality |
2008 |
25 |
Author Supervision “Rehabilitation of the road R30 Anenii Noi–Stefan Voda–Causeni, km 47÷77” |
State Road Administration, Chisinau municipality |
2008 |
26 |
Detailed Design “Total repair of the streets: 31 August 1989, Chisinaului, Sadoveanu, Unirii in Orhei town, L=5 km”
|
Orhei Town Hall |
2008 |
27 |
Detailed Design “Rehabilitation of the road L339 Ustia–Molovata, km 11-26 / Rehabilitation of the access road to Oxentia village”
|
State Road Administration |
2008 |
28 |
Author Supervision: Reinforcement Works of the Prut River bank and passenger port infrastructure |
Ungheni River Port |
2008 |
29 |
Author Supervision: Republican Center of Veterinary Diagnosis, administrative building, phase III |
Republican Center of Veterinary Diagnosis |
2008 |
30 |
Author Supervision: Construction of the Tudora Customs infrastructure |
Custom Service, Republic of Moldova |
2007 |
31 |
Engineering systems, infrastructure and settlement of the Otaci Custom
|
Custom Service, Republic of Moldova |
2007 |
32 |
Author Supervision: Reconstruction of the administrative building of the Chisinau Customs Office |
Custom Service, Republic of Moldova |
2007 |
33 |
Detailed Design for the road R20 „Rezina–Orhei–Calarasi, km 0÷46” |
State Road Administration, Chisinau municipality |
2007 |
34 |
Detailed Design “Rehabilitation of the road L364, L363” Hartop–Dorotcaia–Cosnita, km 13÷18”
|
State Road Administration, Chisinau municipality |
2007 |
35 |
Detailed Design „Rehabilitation of the bridge on Mihai Viteazu street, Chisinau municipality |
General Department of the Public Transport and Communications |
2007 |
36 |
Detailed Design “Pavement rehabilitation on the section Glodeni–Cobani–Moara Domneasca, including Glodeni town bypass and the access road to the forest, km 0÷48” |
State Road Administration, Chisinau |
2007 |
37 |
Detailed Design “M21 road rehabilitation of Chisinau–Dubasari–Poltava, km 6÷15, section km 5+400÷6+400, including the total repair of the bridge over Bic river and the railway flyover”
|
State Road Administration, Chisinau |
2007 |
38 |
Detailed Design for “Repair and construction in Condrita village Chisinau municipality” |
Condrita Town Hall, Chisinau |
2007 |
40 |
Total repair of Eminescu street in Bubuieci village, Chisinau municipality
|
Bubueci Town Hall, Chisinau municipality
|
|
41 |
Feasibility Study for Rehabilitation Program for local roads, Orhei
municipality |
Road Construction and Common Administration Department of Orhei Town Hall |
2007 |
42 |
Technical Expertise “Bridge over railway on the road section Balti–Slobozia, km 23” |
Project Verification and Expertise Department |
2007 |
43 |
Detailed Design “Scoreni–Truseni road repair, Straseni region”
|
Scoreni Town Hall, Straseni region |
2007 |
44 |
Detailed Design „R20 road repair Rezina–Orhei–Calarasi, km 50÷64 (Orhei–Vatici section)” |
State Road Administration, Chisinau |
2007 |
45 |
Detailed Design „R30 road repair Anenii Noi–Stefan Voda–Causeni, km 47÷77” |
State Road Administration, Chisinau |
2007 |
46 |
Reconstruction and total repair of the Veterinary Diagnosis Center, Construction of the Radiology Center, Chisinau municipality, 1st phase “Construction of the testing laboratory of food of animal origin” |
Center of Veterinary Diagnostics |
2006 |
47 |
Detailed Design „Tudora Customs complex infrastructure construction”
|
Customs Service, Republic of Moldova
|
2006 |
48 |
Detailed Design „Reconstruction of the Customs Service administrative building Chisinau”
|
Customs Service, Republic of Moldova |
2006 |
49 |
Detailed Design „Reconstruction of the Customs Service administrative building Sculeni” |
Customs Service, Republic of Moldova |
2006 |
50 |
Detailed Design „Road repair in Tabora village, Orhei region” |
Vatici Town Hall of Orhei region |
2006 |
51 |
Detailed Design „R 30 road repair Anenii Noi–Causeni–Stefan Voda–border with Ukraine, km 76÷95” |
State Road Administration, Chisinau |
2006 |
52 |
Organization and repair project of the viaduct Botanic Center in Chisinau city, phase II |
„Poduri Prim” Ltd |
2006 |
53 |
Detailed Design „Total repair of Testemiteanu street and access road to Maternity Hospital in Soroca city” |
Soroca Town Hall |
2006 |
54 |
Detailed Design „Access road to Humulesti village, Bubuieci village, Chisinau municipality” |
General Directorate for Public Transport and Communications, Chisinau municipality |
2006 |
55 |
Detailed Design „Repair of Serghei Lazo, Mihail Kogalniceanu, Alexei Mateevici streets, 1st phase, Chisinau municipality” |
General Directorate for Public Transport and Communications, Chisinau municipality |
2006 |
56 |
Detailed Design „Repair of V.Alecsandri, M.Eminescu, Gh. Asachi Streets, 2nd phase, Chisinau municipality” |
General Directorate for Public Transport and Communications, Chisinau municipality
|
2006 |
57 |
Detailed Design „Repair of the bridge on Serghei Lazo street in Colonita village, Chisinau municipality”
|
Colonita village Town Hall, Chisinau municipality |
2006 |
58 |
Detailed Design „Total repair of the central area streets B. Bodoni, Pushkin, Mitropolit Varlaam, Alexandru cel Bun, 3rd phase” |
General Directorate for Public Transport and Communications, Chisinau municipality |
2006 |
59 |
Detailed Design „Total repair of the central area streets in Chisinau city: 31 August 1989, Columna, Armeneasca streets” |
General Directorate for Public Transport and Communications, Chisinau municipality |
2006 |
60 |
Detailed Design „Colonita village road repair, Chisinau municipality” |
Colonita Town Hall, Chisinau municiality
|
2006 |
61 |
Detailed Design “Repair of the customs administrative building in Comrat town” |
Customs Service, Republic of Moldova |
2005 |
62 |
Detailed Design ”Reconstruction and extension of the Criva Customs Service” |
Customs Service, Republic of Moldova |
2005 |
63 |
Detailed Design for the repair of the administrative building roof SED Calarasi
|
SED Calarasi
|
2005 |
64 |
Repair of the roof and house of culture with 600 sits in Baraboi village, Donduseni region |
Baraboi Town Hall, Donduseni region |
2005 |
65 |
Investigations and Detailed Design of the Shopping Center on Ion Creanga street in Chisinau city |
MMG BC „Grisan-Hamb” SA Company |
2005 |
66 |
Detailed Design „Repair of the Health Center in Ermoclia village Stefan Voda region” |
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
67 |
Detailed Design “Repair of the Health Center in Volontiri village, Stefan Voda region”
|
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
68 |
Detailed Design „Repair of the Health Center in Cazaclia village, Ceadir-Lunga region” |
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
69 |
Detailed Design „Repair of the Health Center in Iscalau village, Falesti region” |
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
70 |
Detailed Design „Repair of the Health Center in Larga village, Briceni region”
|
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
71 |
Detailed Design „Repair of the Health Center in Musait village ,Taraclia region”
|
The Health Investment Fund within the World Bank Project and Health Ministry |
2005 |
72 |
Detailed Design „Customs storehouse at the border crossing point Leuseni”
|
Customs Service, Republic of Moldova |
2005 |
73 |
Correcting the Detail Design “Construction of the bridge over Isnovat river in Ialoveni city” |
Ialoveni Town Hall |
2005 |
74 |
Detailed Design „Repair of Eliberarii street in Orhei town”
|
Orhei Town Hall |
2005 |
75 |
Detailed Design and author supervision “Repair of the road in Bogzesti village, Telenesti region” |
Bogzesti Town Hall, Telenesti region, through the Social Investments Project in Moldova |
2005 |
76 |
Detailed Design and author supervision “Repair of the street and the bridge in Draguseni village, Hancesti region” |
Draguseni Town Hall, Hancesti region, through the Social Investments Fund in Moldova |
2005 |
In Russia
|
1 |
Detailed Design Reconstruction of the road Korocha – Gubkin – Gorshechnoe, km 71+500 ÷ 55+600, Belgorod region |
Belgorod Roads Department, Russia |
2008 |
2 |
Detailed Design Bypass of Starii Oskol in Belgorod region |
Belgorod Roads Department, Russia |
2008 |
3 |
Detailed Design Gubkin Bypass in Belgorod region |
Belgorod Roads Department, Russia |
2008 |
4 |
Detailed Design Construction of the bypass of Starii Oskol city, Belgorod region |
Belgorod Roads Department, Russia |
2007 |
5 |
Engineering Design Reconstruction of the road Korocha – Gubkin – Gorshechnoe, km 71+500 ÷ 88+600, Belgorod region |
Belgorod Roads Department, Russia |
2007 |
6 |
Detailed Design Construction of the bypass Cherneanka – Zarechnoe villages to road Starii Oskol – Cherneanka – Novii Oskol, Cherneanka district, Belgorod region |
Belgorod Roads Department, Russia |
2006 |
7 |
Detailed Design Total repair of the road Novokavkazskii village – Malostepnovskii village, km 11+000 ÷ 16+600, Aleksandrovsk district, Stavropol region |
Road Administration Department of the Ministry of Industry, Transport and Communications, Stavropol region |
2004 |
8 |
Topo-geodesic works for land parceling situated in the Beneficiary’s expropriation area with the borders recovery of expropriation area within the districts Valuisk and Borisovsk, Belgorod region |
Belgorod Roads Department, Russia |
2003 |
9 |
Testing works and design for parceling the lands taken by the roads of Petrovsck districts, Belgorod region |
Belgorod Roads Department, Russia |
2003 |
10 |
Carrying out the testing works for rehabilitation of the railway route of Iakovlev district, 25 km, Belgorod region |
Belgorod Roads Department, Russia |
2003 |
11 |
Detailed Design Repair of the railway flyover at km 2+150 on the road Svetlograd – Blagodarnii – Budenovsk, Stavropol region |
Road Administration Department of the Ministry of Industry, Transport and Communications, Stavropol region |
2002 |
12 |
Detailed Design Repair of the bridge at km 6 on the road Aleksandrovskoe – Krugloleskoe, Aleksandrovsk district, Stavropol region |
Road Administration Department of the Ministry of Industry, Transport and Communications, Stavropol region |
2002 |
13 |
Topo-geodesic works for land parceling situated in the Beneficiary’s expropriation area with the borders recovery of expropriation area within the districts Graivoron and Ivniansk, Belgorod region |
Belgorod Roads Department, Russia |
2002 |
14 |
Detailed Design Rehabilitation of the bridge over Podkumok river near Shaumeanskii village, Georgievsk district, Stavropol region |
Road Administration Department of the Ministry of Industry, Transport and Communications, Stavropol region |
2002 |
15 |
The study Justification of the Volokonovka bypass construction on the bridge section over Oskol river, Belgorod region |
Belgorod Roads Department, Russia |
2001 |
16 |
Engineering Design Volokonovka bypass construction on the bridge section over Oskol river, Belgorod region |
Belgorod Roads Department, Russia |
2001 |
17 |
Detailed Design Construction of the road Sevalnyi – Holki, Novooskolsk district, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
18 |
Detailed Design Construction of the road Leninskiy – Marino, Schebekino district, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
19 |
Detailed Design Construction of the access road Belgorod – Schebekino in the small district Pesсhanyi, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
20 |
Detailed Design Construction of the bridge over Oskol river on the road Kozlovka – Oskolishe, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
21 |
Detailed Design Repair of the road Kozlovka – Oskolishe, Volokonovka district, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
22 |
Detailed Design Construction of the road Moscow – Samara with the bypass of Putyatino village, km 308÷312 in Ryazan region, 1st technical category |
GiprodorNII, Moscow city |
2000 |
23 |
Detailed Design Construction of the road Moscow – Samara in Ryazan region with the bypass of Kiritzi and Sushki villages, km 250÷257 |
GiprodorNII, Moscow city |
2000 |
24 |
Detailed Design Construction of the road Krasnaya Iaruga – Novaya Berezovka, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
25 |
Detailed Design Access road construction in Otradovskii village, Belgorod region |
Belgorod Roads Department, Russia |
2000 |
In Romania
|
1 |
Detailed Design “Repair and reinforcement of streets in Constanta municipality, 1st of May boulevard (old)” |
Consilier Construct Bucharest |
2004 |
2 |
Detailed Design “Repair and reinforcement of streets in Constanta municipality, Adamclisi street” |
Consilier Construct Bucharest |
2004 |
3 |
Detailed Design “Repair and reinforcement of streets in Constanta municipality, Aurel Vlaicu boulevard“ |
Consilier Construct Bucharest |
2004 |
4 |
Detailed Design “Repair and reinforcement of streets in Constanta municipality, Dezrobirii boulevard” |
Consilier Construct Bucharest |
2004 |
5 |
Repair and reinforcement of streets in Constanta municipality, Caraiman street (section of Mangaliei street – 1st of May boulevard) |
Consilier Construct Bucharest |
2004 |
6 |
Repair and reinforcement of streets in Constanta municipality, Cismelei street |
Consilier Construct Bucharest |
2004 |
7 |
Repair and reinforcement of streets in Constanta municipality, Dobrila Eugeniu street |
Consilier Construct Bucharest |
2004 |
8 |
Repair and reinforcement of streets in Constanta municipality, Soveja boulevard, Mamaia boulevard – Dezrobirii street |
Consilier Construct Bucharest |
2004 |
9 |
Repair and reinforcement of streets in Constanta municipality, Suceava street |
Consilier Construct Bucharest |
2004 |
10 |
Repair and reinforcement of streets in Constanta municipality, Pescarilor 2 street |
Consilier Construct Bucharest |
2004 |